The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
The construction scope of work consists of: framing of all metal stud walls & ceiling, installation of vapor barrier, Installation of rigid foam an batt insulation, installation of sheetrock with taping and bedding. Additional scope of work includes all caulking, epoxy floor sealer and prime painting of the sheetrock walls. The interior double door is to remain in place. Field verify all measuremnts.