The permit office, located at the General Offices in Libertyville will be closed Friday, December 13 from 9 am–12:30 pm. You can still purchase permits...
The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
• Removal and proper disposal of existing system per EPA guidelines
• Install Carrier 8-ton single circuit condensing unit
• Install Carrier 8-ton packaged air handling unit with combo mixing box section
• Flush and reuse existing refrigeration line set
• All ductwork modifications
• Connect to existing piping, controls and electrical
• All materials and labor required for installation
• Complete system start up
• Labor & all materials warranted for one year from date of installation