The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
Reconstruction of an existing Unilock Brussels Block unit pavement located at the rear of the golf clubhouse. The pavement consists of an upper terrace (approximately 5480 square feet) and a lower golf cart parking area (approximately 2320 square feet) for a total of approximately 7800 square feet. The work includes the removal and on-site storage of the existing pavers, removal of a drainage system, adjustments to the existing gravel base, installation of a new drainage system, adjustments and or replacement of unit curbing, replacement of plastic edging and re-installation of the removed pavers with additional new pavers as needed.