The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
Remove existing VCT flooring and clean and prep floors and walls (reinforce cracks) to receive a new epoxy floor and integral epoxy cove base. All drains must be reinforced per specs. Install the new epoxy flooring and base per specs and once done, cleanup work area.