The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
The project consists of the construction of approximately 1600 lineal feet of eight foot-wide asphalt trail and related improvements including approximately 500 lineal feet of permanent sheet pile wall with cap and custom safety fence, ornamental steel fence, drainage structures, grading, vegetation removal, seeding and erosion control measures.
Addendum 1 posted to website.