The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
Provide follow-up watering treatments (maintenance) to trees and shrubs that were installed in fall 2022 at General Offices, Cuba Marsh, Fox River, Ray Lake, Grant Woods, Stevenson Home and Old School Forest Preserves.
The scope of work for this project shall include all labor and equipment to complete watering treatments of trees and shrubs at the above sites. Depending on rainfall during the 2023 growing season, reforestation sites (Work Sites) may require watering as many as six times. The specific timing of watering shall be determined by Owner Project Manager based on soil conditions at the site.
The Contractor shall provide all necessary equipment and tools including: vehicles, gas for travel, and watering equipment (water tanks, sprayers, pumps, etc.).