The site navigation utilizes arrow, enter, escape, and space bar key commands. Left and right arrows move across top level links and expand / close menus in sub levels. Up and Down arrows will open main level menus and toggle through sub tier links. Enter and space open menus and escape closes them as well. Tab will move on to the next part of the site rather than go through menu items.
Owner invites sealed Bidder’s Proposals for the Work described in detail in the Contract and generally described as follows:
The Work to be performed under this Contract consists of the complete construction of the Millennium Trail – Van Patten Woods Connection in accordance with the Plans, Contract Documents and Specifications contained in the contract. The Work shall also meet the requirements of all permitting agencies. The Work generally includes, but is not limited to construction of 2,800 feet of 10 foot wide HMA trail, 1,600 feet of storm sewer, 2,200 of curb and gutter, sidewalks with detectable warning, HMA driveway removal and replacement, pavement markings, sign installations and restoration including fine grading, seeding and sodding.
The Work shall be performed at the following Work Site:
Van Patten Woods Forest Preserve
15601 West Russell Road
Wadsworth, Illinois